Our Expertise

One Continuous Metal Roof Sheet

WHA uses single metal sheet therefore there is no connection on the metal sheet roofing which is the major leak for other warehouses that use multi roofing sheets.

Air Gap Roof Insulation

The micro fiber insulation will be installed beneath roofing to create air gap which acts as another layer of insulation. With this method, WHA warehouses will have lower inside temperature than other general warehouses.

Natural Ventilation

WHA has metal sheet louvers with bird screen around the building. In addition, as a result of our research contribution on the ventilation in the warehouse, the jack roof in the middle of our warehouses will be installed at the higher level than the ones in regular warehouses in order to maximize wind flow and avoid short circuit of wind flow.

GMP Practice Compliance

The WHA’s warehouses, distribution centers, and factories will be well-designed since the beginning in order to comply with and the GMP Practice. All of the WHA properties will be designed to match with the GMP requirements such as the GMP toilet, to minimize dust accumulation, and to prevent the termite, bird, or even insects.

Burnished Floor Finish (Mirror Floor Finish)

WHA uses high strength concrete to do the warehouses floor instead of normal concrete. In addition, the new technique called “Burnished Floor” is implemented to treat the surface of the floor. As the result of mastering this technique, the floor will have high abrasive strength capacity which makes it more durable for heavy duty and also minimize dust and cracks that may occur in case of high traffic usage.

Special Heat Treatment Floor Finish (Mirror Floor Finish)

WHA uses special concrete to do the warehouses floor instead of normal concrete. In addition, the new technique is implemented to treat the mirror surface of the floor. As the result of mastering this technique, the floor will have high abrasive strength capacity which makes it more durable for heavy duty and also minimize cracks that may occur in case of high traffic usage.